Industrial equipment comes with option lists: a dozen items at best, forty or fifty at worst. Sales reps can explain which option depends on which, but buyers forget, and a printed matrix helps nobody. A 3D product configurator solves exactly this, yet whether the project succeeds rarely depends on the 3D tech itself. It depends on the preparation. Five steps below, from the option list to launch day.
The basic idea of option based configuration was covered in an earlier post on what a 3D configurator is. This one goes straight into the work.
Step one: write the option list and the rules on paper first

Go through the sales configuration manual and record three things: which options are mandatory, which exclude each other, which depend on others. A high-power motor unlocks the frequency cabinet; upgrading the guard removes the standard one from the bill. Prices matter too, not just unit prices but combined and tiered ones. The quality of this option list decides everything downstream, so two extra days here pay off.
The most commonly missed item is the default configuration. What the buyer sees on first load, sales and engineering often disagree on. Decide it early.
Step two: split the model into real parts
A configurator model is not one solid shell. It gets broken into independent parts and exported as GLB models: base, motor, guard, control panel, each with its own materials. Polygon reduction cannot be skipped, the whole scene must run smoothly in a browser, on an old office computer included.
No in-house modeling team is fine. CAD drawings plus photos of the real machine are enough, modeling can be outsourced, and the quote should be requested together with the development project.
Step three: rules go into the backend, prices follow
Paper rules become backend logic: pick A and B unlocks, choose C and D grays out, and with every click the price updates in real time. This is what separates a configurator from plain 3D display. Leave an exit door too: one click after configuration turns the result into a structured list that lands in an inquiry form or a sales inbox. Sales receives data, not screenshots. The delivery scope is described in detail on our 3D configurator development service page.
Step four: loading speed and mobile, write them into acceptance
Industrial buyers open configurators on phones at trade fairs and on shop floors. If the first screen takes five seconds, they leave. Split loading, a progress indicator and a fallback for weak devices all belong in the acceptance criteria. Two interaction details worth keeping: clear part highlighting, and a one-click undo after a mis-tap.
Step five: test with the real sales process before launch
Passing internal tests is the passing grade, nothing more. Let sales reps bring the configurator to two or three existing customers and watch where they get stuck, whether they can assemble a combination that cannot be manufactured. Collect, fix, repeat. After launch the work continues, options change with the product line, so the backend must let your own team add options and edit prices. Put that in the contract before signing.
Six weeks is a realistic best case from kickoff to launch; three months for a complex product is normal. Finished projects can be seen on the case page for reference. Done properly, the configurator becomes a sales tool, not a decoration on the website.
Related Q&A
What materials should we prepare for a 3D configurator for industrial products?
The configuration manual or option price list is the foundation, plus CAD drawings, photos of the real machine or existing 3D files. The more complete the materials, the faster the early alignment goes.
How long does a 3D configurator take and what does it cost?
It depends on the number of options and rule complexity. Around a dozen options with simple rules, roughly six weeks. Heavy rules with ERP integration, three months is normal. Pricing is project based; cap the option count and revision rounds in the contract.
Can the configuration result connect to our existing quoting system?
Yes. The output is structured data and can feed quote sheets, ERP or CRM through an interface. Map the fields before development starts and put the integration scope in the requirements.